Grout has been added to the tile in the basement bathroom. Also doors added, including the linen closet door.
Shelf finished along the basement wall. There was lots of dust and paint particles in the air today.
The window has been framed in the guest bedroom in the basement.
Justin is standing in our storm shelter in the basement.
Built-in shelf added at the base of the stairs.
Basement patio doors have been trimmed.
Painting of the walls has begun. You can see our 'Ashen' color (a shade of taupe) against the white ceiling.
The back of the kitchen island now has wood panels.
This is the south wall of the kitchen. We have a butler's pantry and a place to put mail and other things.
Grout has been added to the laundry room floor.
Southwest corner of the kitchen.
Tile has been laid in the master bathroom. It is a brownish-gray color.
Grout has been added in the guest bathroom upstairs.
Our builder is working on the master closet build-out. Here is a stack of shoe shelves. :)