Cabinet doors and drawer fronts have been added to the island!
And to the rest of the kitchen!
Cabinet doors added in the laundry room.
Tile has been laid in the master shower floor.
Master closet! Look at all of those shoe shelves! :)
Grout has been added to the tile in the master bathroom.
Window framed in our daughter's bedroom.
Drawer fronts and cabinet doors added in the basement bathroom.
Trim work continues in the basement.
The closet in the basement bedroom has been framed.
Hallway in the basement. Trim has been added around the doors and along the floor.
Top shelf at the base of the stairs has now been built out as well.
No comments:
Post a Comment