Lots of progress in the last few days! Cabinets have been installed in the laundry room and tile has been laid.
Linen closet in the master bathroom, next to the shower.
Master bathroom floor has been prepped for tile. Door is waiting to be installed. Cabinets installed.
Master bedroom door installed.
Guest bathroom cabinets installed. Tile has been laid (upstairs).
Closet doors installed in the guest bedroom upstairs.
Closet doors and bedroom door installed in our daughter's bedroom. Trim has been started all over the house.
Upstairs hallway. Linen closet at the end.
Living room and dining room. The long boards are all trim pieces.
Trim started around the coat closet, next to the front door.
Basement bathroom vanity installed and tile laid.
Tile also laid in the toilet and shower portion of the basement bathroom.
Linen closet in the basement bath. Yep, we have 3 linen closets, and I'm so excited about it!
Guest bedroom in the basement.
HVAC and hot water heater in the unfinished storage area in the basement.
Standing in the unfinished bedroom in the basement, looking into the unfinished storage area.
Basement living room, doors hung and trim started!